Skip to content
Port gantry cranes at dusk

Projects & case studies

Engagements measured by operational results

The following anonymised summaries reflect the scope and outcomes of recent client programs. Figures are representative of the engagements described.

Agriculture & Agri-Food

Consolidated export program for a pulse-crop exporter

Client: Prairie agri-food exporter

Challenge

A Manitoba-based exporter faced fragmented carrier relationships and inconsistent container availability during peak shipping windows, resulting in demurrage exposure and missed vessel cut-offs.

Our approach

We consolidated ocean procurement under managed carrier agreements, introduced a booking calendar aligned to vessel schedules at Vancouver and Prince Rupert, and implemented milestone tracking from inland load to overseas discharge.

Outcomes

98.6%
On-time vessel cut-off
CAD 410K
Annual demurrage reduction
11 days
Booking lead-time improvement

Energy, Mining & Resources

Heavy-haul delivery of processing equipment to a remote site

Client: Northern resource operator

Challenge

A processing-plant expansion required the delivery of over-dimensional modules to a Northern site with seasonal road access and limited crane availability.

Our approach

Our project team completed a route survey, secured provincial OD/OW permits, scheduled movements within the winter-road window, and supervised heavy-lift placement under an approved method statement.

Outcomes

100%
Modules delivered on schedule
23
Permitted oversize moves
0
Recordable safety incidents

Retail & Consumer Goods

Import consolidation and Prairie distribution hub

Client: National retail group

Challenge

A retailer importing from multiple overseas origins needed faster customs release and a central distribution point to serve stores across Western Canada.

Our approach

We established a CARM-aligned clearance program, consolidated freight at origin, and stood up a Winnipeg distribution hub with WMS integration and store-level order management.

Outcomes

< 4 hrs
Average customs release time
99.4%
Inventory accuracy
−14%
Distribution cost-to-serve

Industrial & Manufacturing

Just-in-time inbound program for a continuous-production plant

Client: Industrial manufacturer

Challenge

Unplanned inbound delays were causing line stoppages at a manufacturer operating a continuous production schedule.

Our approach

We designed an inbound control tower with carrier SLAs, cross-border customs pre-clearance, and exception alerting, supported by quarterly performance governance.

Outcomes

99.1%
Inbound on-time delivery
−92%
Line stoppages (logistics-related)
18,400 loads/yr
Managed inbound volume

Confidentiality

Discretion as standard

Client identities and commercially sensitive details are withheld in published material. Detailed references are available under confidentiality on request.

Discuss your supply-chain requirements

Speak with our team about freight, customs and distribution programs tailored to your operations. Direct line +1 260-233-5234.